Norway Narvik 230 MW — Stargate (Nscale/Aker)Nordic 100 MW — Luleå SE1 (Sweden)Edge 5 MW — NYC Metro+ new scenariocase norway_narvik_230mw · engine devConsoleWhy it binds
The red arrow is the binding edge — hardware, gap 68.3 %. It is drawn, never hidden.
Inspector — compute
Efficiency is the only way to grow under a fixed ceiling.
GenerationBlackwellUltrascenario
TEE1350000 tokens/kWhscenario
Rack density80 kWscenario
GPU queue16 months◌ derived
Fragmentation loss7.2 %◌ derived
Whether that is acceptable is a judgment this model does not make.